SPRAYBOND has been specially developed for the adhesion of STRUCTASEAL® EPDM on vertical and horizontal surfaces of e.g. timber, concrete, tissue faced insulation boards, etc. The surface must be flat, clean, dry and grease-free. The installation temperature should be > +5 °C.
Before use, shake the aerosol can for at least 30 seconds, after which the adhesive can be applied on both substrates. Leave the adhesive for between 5 - 20 minutes for the solvents to evaporate (depending on temperature and weather conditions) until it is touch dry. Carefully apply the STRUCTASEAL® EPDM to the surface without creases and air bubbles then compress with a silicone roller. The SPRAYBOND is not suitable for making seam connections or bonding accessories (rainwater drains and prefabricated corners).
• COVERAGE RATES
Consumption depends on the substrate (applied on both sides) approx. 0.35 l/m2.
• STORAGE
Store the spray can in a dry and in a cool area (> +5°C) in a well ventilated space.
Keep away from possible sources of ignition.
No smoking in the vicinity of the spray can.
Do not place the aerosol in direct sunlight, avoid exposure to temperatures above 40 °C.
Download our instsallation instructions
Download Data Safety Sheet