• Frequently Asked Questions (F.A.Q)/
  • Contact
Open Search...
Logo
Frequently Asked Questions (F.A.Q)Contact
Close Icon
HOME
ABOUT STRUCTASEAL
PRODUCTS
APPLICATIONS
INSTALLATION
Logo
HOME
ABOUT STRUCTASEAL
PRODUCTS
APPLICATIONS
INSTALLATION
Home

INSTALLING STRUCTASEAL® EPDM ROOFING TO INSULATION BOARDS

For bonding STRUCTASEAL® EPDM roofing on an insulated roof construction, we distinguish between the adhesion of the central roof surface and the edges and upstands. To prevent physical building problems a vapour barrier must be installed under the insulation boards. STRUCTASEAL® EPDM roofing can only be adhered to tissue faced insulation boards. For optimal adhesion of the roof surface STRUCTASEAL® PU Bonding Adhesive is used.

Regardless of the surface or height of the roof, the edges and upstands must always be bonded with STRUCTASEAL® Contact Adhesive. The SPRAYBOND variant provides an optimal ease of installation option.

Fast
Fast
Easy
Easy
Safe
Safe
CCM Logo
STRUCTASEAL®

Ground Floor Office Suite
Lancaster House
Concorde Way
Millennium Business Park
Mansfield
Nottinghamshire
NG19 7DW
United Kingdom
T +44 (0)1623 627 285

F +44 (0)1623 652741

E info.uk@ccm-europe.com

© 2026 CCM Europe
About STRUCTASEAL®
  • About Structaseal
  • STRUCTASEAL® Distributors
  • Information for purchasing organisations
Applications
  • Roof Waterproofing
  • Facade Sealing
  • Gutter Seal
Legal
  • Disclaimer
  • Privacy Statement
Producten
  • EPDM Roofing
  • Epdm Strips
  • Accessories
  • Adhesives And Sealants
  • Lead Alternative
Installation
  • Timber Surfaces
  • Geisoleerd Dak
  • Gutter
  • Videos
DOWNLOAD OUR INSTALLATION GUIDELINES
Video thumbnail

INSTALLATION INSTRUCTIONS

The surface must be flat, clean, grease-free and dry. For optimal adhesion, walk through the following points step by step:

Bonding to the roof surface:

  • Mark 150 mm from the roof edge using a chalk line.

  • Determine the correct position on the roof based on the supplied roll-out sketch.

  • Fully unfold the EPDM roofing membrane and drop over the roof edge.

  • Half fold the EPDM membrane across the roof.

  • Apply the Bonding Adhesive PU over the insulation boards by means of the pouring spout (apart from the 150 mm marked area and the upstands).

  • Spread the adhesive evenly over the surface of the insulation boards with a fleece roller. (apart from the 150 mm marked area and the upstands).

  • Depending on the temperature, wind and humidity, leave the adhesive for 5 to 20 minutes to allow the solvents to evaporate.

  • Roll the EPDM back into the adhesive.

  • Brush the EPDM membrane lightly with a soft broom. Repeat the above steps for the other half of the roof surface.

Edge fixation

  • Apply SPRAYBOND CONTACT ADHESIVE to the remaining 150 mm of the roof surface and the raised edges.

  • When the contact adhesive is touch dry, bond the EPDM bond securely without air pockets. Always work from the middle to the sides. Use a flat hand to wipe the EPDM into the surface and against the upstands. 

  • Roll the EPDM with a silicone compression roller.

ePDM_dakbedekking

FEEL FREE TO CONTACT US

REQUEST FOR ADVISE?

Are you curious about what STRUCTASEAL® can do for you? Do you need installation advice? We are happy to help you on your way!

CONTACT US
VERWERKINGSRICHTLIJNEN